Water Industry
|
Most Recent 5 Water Related Case Histories [Click here for more]
Case History Report:
CHS20070914-0003
|
Multistage pump
|
|
Problem: Meantime between failure is 5 years. There is corrosion of base relating to higher energy costs.
|
Case History Report:
CHS20070914-0004
|
Multistage pump
|
|
Problem: Meantime between failure is 3 years. There is corrosion happening relating to higher energy costs.
|
Case History Report:
CHS20070918-0008
|
Office building's chill water plant
Equipment: OTHER
VERTICAL TURBINE
|
|
Problem: Meantime between failure was 1 year due to high pressure.
|
Case History Report:
CHS20070914-0002
|
Filter flush pumps
|
|
Problem: The previously installed packing's meantime between failure was 5 years. The customer also report problems with corrosion and high energy costs.
|
Case History Report:
CHS20051220-0001
|
Water Industry, Philippines
Equipment: Pipes
Various
|
|
Problem: Water authority carries out maintenance on each of their drilled wells every 3 months. A big problem is corrosion on the threads and the pipes have to be frequently replaced. Previously, a vegetable based material was used as a thread lubricant.
|
|
|